|
Tap Permit, Equipment, and Inspection
Tap Connection Fee |
MTSA Uniform tap fee, all systems. |
$3,600.00 per EDU |
MTIS Fee in addition to tap fee |
Pine Creek North Fork Watershed, Pine Twp. |
$923.00 per acre |
FP Tap Fee, in addition to tap fee |
Fish Run Watershed, Franklin Park. |
$1,833.00 per tap |
Sewer Tap Machine |
1 Line tap |
$200.00 per tap |
|
1 Manhole Tap |
$300.00 per tap |
|
4 Taps or more |
$155.00 per tap |
Lateral Connection Inspection Fee |
In addition to tap fee |
$50.00 each tap |
Lateral Installed w/o inspection |
Closed circuit televised inspection by MTSA |
$250.00 each lateral |
Scheduled tap or inspection |
Not ready; nor cancelled |
$50.00 each occurrence |
Grease Traps |
Inspection Fee |
$50.00 |
Illegal Connection |
Penalty, plus any outstanding costs for an illegal connection. The connection must be
excavated and shored for proper inspection by MTSA personnel. |
$300.00 per day/per occurrence. |
Demolition of Abandoned Service Sewers
Application and Inspection |
Termination of Sanitary Sewage Service |
$25.00 each |
|